Coal Sludge Handling System

  • Project Overview

    Project: Waste Filter Cake Fly and Ash Handling System

    Client: Dominion Power

    Job Site: Clover Power Station
    Clover, Virginia

    Scope of Work: Turnkey Design, Engineering, Procurement, and Construction

    Project Description:
    EDC was awarded an EPC contract for the design, engineer, procure, and install the Waste Filter Cake and Fly Ash Handling System Upgrade at Dominion Power’s Clover Power Station in Clover, VA.  This system was completed and put into operation in 2010.

    This project involved the replacement of shuttle conveyors that are part of Clover Power Station’s coal sludge handling system.  Turnkey design, engineering, and construction of this system were essential in order to replace the conveyors without interrupting the plant’s ability to handle sludge.