Coal Sludge Handling System
Project Overview
Project: Waste Filter Cake Fly and Ash Handling System
Client: Dominion Power
Job Site: Clover Power Station
Clover, Virginia
Scope of Work: Turnkey Design, Engineering, Procurement, and Construction
Project Description:
EDC was awarded an EPC contract for the design, engineer, procure, and install the Waste Filter Cake and Fly Ash Handling System Upgrade at Dominion Power’s Clover Power Station in Clover, VA. This system was completed and put into operation in 2010.
This project involved the replacement of shuttle conveyors that are part of Clover Power Station’s coal sludge handling system. Turnkey design, engineering, and construction of this system were essential in order to replace the conveyors without interrupting the plant’s ability to handle sludge.
|
|
|