 |
 |
|
|
|
| |
|
|
|
 
|
|
| Traveling
Stacker with Boom Slewing Conveyor Belt -
180 Degree Rotation.
Handling
Coal @ 800 MTPH
Santa Marta, Colombia
|

|
|
Three
Radial Stackers
Handling 450 TPH Fly Ash, Filter Cake, and Sludge.
Jewett, TX |
 |
|
Ore
Blending System, Boron, Ca
Bucket Wheel Bridge Reclaimer Rail Mounted
Computer Controlled Unmanned Continually
Operated to Reclaim Blended Boron Ore Pile
@150 TPH.
Designed with Double Harrow for Forward or
Reverse on 85 ft. c/c Rails |

|
|
Ore
Blending System, Boron, Ca
Bucket Wheel Bridge Reclaimer Rail Mounted
110 ft. c/c/ Rails Computer Controlled
Unmanned Continuously Operated to Reclaim
Blended Boron Ore Piles @ 1000 TPH.
Forward or Reverse Travel Between Two
Storage Piles Operating Since 1979. |

|
|
Ore
Blending System Twin Boom Traveling
Stacker for Storage of Borax Ore, Computer
Controlled Unmanned Stacker Continuous
Operation.
Capacity of 1200 STPH
Boron, Ca |
 |
|
Twin
Boom Traveling Stacker Receiving Port
Terminal.
Design for 4000 LTPH of Aragonite from
Self-Unloading Vessel.
Jacintoport, TX |
 |
|
|

|
|
|
|
|
|
| |
|
| |
|
67 Ramapo
Valley Road | Mahwah, N.J. 07430 |
Tel : 201.684.1220 | Fax : 201.684.1224
E-Mail : info@edcincorp.com
|
|
|
|