|
EDC
# |
LOCATION |
DESCRIPTION |
|
2277 |
TOMKINS
COVE, NY |
REPLACEMENT
OF EXISTING TELESCOPIC CHUTES
AT FLY ASH TRUCK LOADING
STATION WITH TOTALLY
AUTOMATED, HYDRAULICALLY
OPERATED, TELESCOPIC CHUTES.
INVESTIGATION
INTO ENCLOSURE OF EXISTING FLY
ASH AND BOTTOM ASH DUMP TRUCKS
TO SATISFY ENVIRONMENTAL
CONCERNS.
INVESTIGATION
INTO VARIOUS ASH CONDITIONER
OPTIONS FOR THE REPLACEMENT OF
EXISTING ASH CONDITIONER
SYSTEM.
INSTALLATION
OF TOTALLY AUTOMATED ASH
CONDITIONING SYSTEM.
INVESTIGATION
INTO ALTERNATE MEANS OF ASH
DISPOSAL IN LIEU OF DUMP
TRUCKS. |
|
2194 |
HUDSON
FALLS, NY |
BELT
CONVEYOR SYSTEM FOR ASH
HANDLING AND INSIDE STORAGE. |
|
2120 |
SHENANDOAH,
PA |
INVESTIGATION
INTO CONVEYING SYSTEM FOR ASH
REMOVAL IN LIEU OF TRUCKS. |
|
1956 |
BRISTOL,
CT |
BELT
AND VIBRATING CONVEYOR SYSTEM,
SCREW CONVEYOR SYSTEM TO
HANDLE BOTTOM AND FLY ASH,
REMOVE METAL AND LOAD AN
INSIDE STORAGE FACILITY. |
|
1793 |
JEWETT,
TX |
SLUDGE
HANDLING (CHEMICAL GYPSUM FOR
AN FGD PLANT). THE SYSTEM
INCLUDES CONVEYING FROM THREE
FILTER LINES AND THREE RADIAL
STACKERS TO STORAGE. (FLY ASH) |
|
1626 |
TAMPA,
FL
BIG
BEN STATION |
BELT
CONVEYOR SYSTEM AND A
HORIZONTAL RADIAL STACKER
(RAIL MOUNTED) FOR SLUDGE
STORAGE FOR AN FGD PLANT -
WASTE HANDLING. |
|
1659
80-006-029
(SLUDGE)
1586
79-006-035
LIMESTONE |
DRAKESBORO,
KY |
COMPLETE
INTEGRATED SYSTEM FOR
DELIVERING LIMESTONE TO AND
REMOVING SLUDGE FROM AN FGD
PLANT. THE SYSTEM INCLUDED A
SPECIAL CAR HAUL SYSTEM AROUND
A CURVED TRACK, RAIL CAR
UNLOADING, CONVEYING INTO
STORAGE SILOS AND RECLAIMING
FROM THE SILOS VIA WEIGHT
FEEDERS AND BELT CONVEYORS. |
|
1354 |
FLORIDA |
SLUDGE
DISPOSAL SYSTEM USING BUCKET
ELEVATORS AND BELT CONVEYORS.
(SOLID WASTE) |
| |
BEVERLY,
OH |
ASH
HANDLING FOR AN INDUCTION
SCRUBBING PILOT FACILITY USING
ENCLOSED CHAIN CONVEYORS FOR
RECEIVING AND SILO LOADING. |
|
1320 |
LAWRENCE,
MASS. |
SEWAGE
PLANT - SLUDGE AND HOT ASH |
|
1265
72-006-006
72-006-007 |
DICKERSON
GENERATING STA.
DICKERSON,
MD |
MgO
& MgSO3 SYSTEM PILOT PLANT |